![](http://photos1.blogger.com/blogger/7245/2634/320/blog1.0.jpg)
The cable care frame is made from 2-inch schedule 40 irrigation pipe. Why? It's easy to work with, is almost impossible to break and comes with lots of interesting connection joints (which makes my life much easier - I know the joints will line up....)
![](http://photos1.blogger.com/blogger/7245/2634/320/blog2.0.jpg)
Here we see the walls going on the frame. Since the garage where I'm constructing the car slopes, I'm "floating" the walls. They will be levelled when I install the replica in the La Entrada school hall.
![](http://photos1.blogger.com/blogger/7245/2634/320/blog3.0.jpg)
Lower walls on the frame. Making progress....